Construction Applications
- Power Plant Gas Turbine-Generator Installation – 275 tons.
- 500 ton Bridge Decking.
- 88 ton Bridge Truss.
- Aerial Connections.
- Handling Multiple Bridge Sections.
- 180 ton Bridge Tie Deam Footing Sections.
- 517 ton Bridge “Dogbones” (40 Lifts for Earthquake Retrofit).
- Bridge Section with CornerMax™ Pads.
- 500 ton Generator.
- 80 ton – 160′ long Concrete Piling.
- 90 ton Vobratory Hammer and 150 ton Piling.
- Vibratory Hammer (90 tons) Setting Pilings.
- Tailing a 55 ton Refinery Vessel.
- 220 ton Cement Kiln.
- 38 ton Steel Pipe Section.
- 755 ton Concrete Platform.
- Level Lift of Crane with Adjustable Bridles.